ActiveSchedule Demo/Tutorial Page 7 of 8

  • This is the third quarter of the editor page.
  • Each time you submit a schedule, you get a shift tabulation
    • Each shift separately
    • Sum of Weekend shifts (latter half of Friday to the latter half of Sunday)
    • Total shifts worked during the time period.

Next page

Shift Summary
(includes only 1/16/2000 - 2/5/2000)

NAME 6a-2p 8a-4p (UC) 10a-6p 2p-10p 4p-12a (UC) 6p-2a 10p-6a WEEKEND SHIFTS TOTAL
BART 0 0 1 0 0 0 0 0 1
CONN 1 0 2 2 4 1 0 4 10
FAIN 3 2 1 1 2 1 2 3 12
HDLR 2 1 1 1 2 1 1 4 9
HRTR 0 0 0 0 0 0 0 0 0
JJM 3 1 1 0 0 3 2 4 10
KANEH 0 0 0 0 0 0 0 0 0
KAUF 1 2 2 2 0 2 1 3 10
KOPP 0 0 0 0 4 0 0 2 4
KSP 0 1 1 3 0 2 1 4 8
KTRK 1 2 2 2 0 1 3 4 11
KYRC 0 0 0 0 0 0 0 0 0
LONG 1 0 3 3 0 3 1 3 11
LPTZ 1 1 1 1 0 2 1 2 7
MICH 1 2 1 1 0 0 1 3 6
MPET 0 0 0 0 0 0 0 0 0
PSR 0 0 0 0 1 0 0 1 1
RBLM 0 1 1 0 0 0 2 2 4
RSBG 0 0 0 0 0 0 0 0 0
RWP 0 1 2 1 0 1 1 1 6
SAUL 0 0 0 0 0 0 0 0 0
SLTR 0 0 0 0 2 0 0 0 2
STON 3 2 0 0 0 1 2 3 8
TBA 0 1 0 0 2 0 0 0 3
VICT 2 3 2 3 1 2 2 5 15
WANG 0 0 0 0 0 0 0 0 0
XXXX 0 0 0 0 3 0 0 3 3
ZULL 2 1 0 1 0 1 1 3 6